• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Retford

On average, our 4 Installers near Retford are rated: (4.70/5)
Order:

DCR offer electricians in Nottingham, Newark, Lincoln and Mansfield for domestic services and projects requiring experienced commercial electrical contractors.

location icon Cook House, Brunel Drive, Newark, NG24 2FB

phone icon01636 706068

ECO CCL - Quality workmanship at affordable prices.

location icon 6 Pinfold Court, Barnby Dun, Doncaster, DN3 1RQ

phone icon01302802072

Here at Lovett Electrical we are a family run business Dealing in Design Installation and commissioning of Domestic, Commercial, Industrial and renewable(...)

location icon The Old Pumping Station, Great Northern Terrace, Lincoln, LN5 8HN

phone icon07969993696

AR-Energy are an established renewable energy and boiler istallation company, based in South Yorkshire with coverage Nationwide. We provide expert advice on(...)

location icon Office 3, 51 High Street , Acorn Business Centre, Barnsley, S63 7JY

phone icon07912665941

On average, our 4 Installers near Retford are rated: (4.70/5)
Order:

location iconNearby we also have installers in Worksop Gainsborough and Doncaster

Latest Job requests posted in Doncaster

04 Oct

Doncaster (DN9)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months. Additional notes: has design.

21 Aug

Doncaster (DN11)

New Solar PV Installation

Direction of roof: North. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: Take Advice. Work Timescale: Within 3(...)

10 Aug

North Thoresby (DN36)

New Battery Installation (Solar PV)

Current system size: 7. Current inverter: Unsure. Work Timescale: ASAP.

20 Jan

Scunthorpe (DN17)

New Solar PV Installation

Direction: South. Pitched. Tiled. No shading. No windows. Open to advice on size. Yes to battery. Within 6 months. Contact after 6pm or at weekends anytime.(...)

06 Dec

Doncaster (DN8)

New Solar PV Installation

Current Fuel Used: Other. Number of Bedrooms: 5+. Number of rooms: 11-15. Property Age: After 1980. Insulation: Unsure. Windows: Double glazing. Work Timescale:(...)

22 Nov

Doncaster (DN11)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: advice needed. Work Timescale: ASAP.

03 Oct

Doncaster (DN4)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Metal. Shading: None. System size required: open to advice. Additional notes: Mobile coffee.(...)

15 Sep

Grimsby (DN34)

New Solar PV Installation

System required: Air to air. Current Fuel Used: Gas. Age: Over 16 yrs. Number of Bedrooms: 3. Number of rooms: 6-10. Property Age:(...)

13 Sep

Scunthorpe (DN15)

New Solar PV Installation

Work Timescale: ASAP.

08 Sep

Doncaster (DN5)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP.

01 Sep

Barton-upon-Humber (DN18)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 6 Months.

05 Aug

Scunthorpe (DN16)

New Solar PV Installation

South West, Pitched/Angled, Tiled, No shading, No windows, Open to advice, Yes to Battery, Timescale: ASAP, House, Owner & Occupier

02 Aug

Grimsby (DN31)

New Battery Installation (Solar PV)

What is the size of your existing Solar system? 12x280W Make/model of Inverter? Sofar Location of battery? Possibly loft Work Timescale Within 3 Months Property(...)

28 Jul

Scunthorpe (DN16)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: advice needed. Work Timescale: ASAP.

28 Jul

Scunthorpe (DN16)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP.

24 Jul

Retford (DN22)

New Battery Installation (Solar PV)

Current system size: 4kw. Current inverter: unsure. Battery location: unsure. Work Timescale: Within 6 Months.

30 Jun

Doncaster (DN9)

New Battery Installation (Solar PV)

Current system size: 8 panels. Current inverter: Unsure. Battery location: OTA. Work Timescale: Within 1 Month.

18 May

Doncaster (DN4)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months. Additional notes:(...)

07 Apr

Brigg (DN20)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Month.(...)

12 Mar

Grimsby (DN37)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP. Additional(...)

12 Aug

Grimsby (DN37)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with installer. Work Timescale: Within 6(...)

11 Jun

Doncaster (DN3)

New Solar PV Installation

Solar PV. Roof: South facing. Pitched and tiled. No shading to affect panels. No windows on roof. Would speak to installer regarding size of system. No to(...)

19 May

Scunthorpe (DN17)

Repair/Maintenance of Solar HW System

System: Solar Thermal but unsure of size. Pressure cyclinder is leaking, price for a new cylinder and repressure system along with water treatment. Repair ASAP.(...)

27 Apr

Barton-upon-Humber (DN18)

New Solar PV Installation

Roof direction: South/ East. Pitched & tiled. No shading. No windows. 16 x panels. 4 kW. system required. Install: within 1 month. Contact: evenings.

31 Mar

Retford (DN22)

New Solar PV Installation

Roof: South facing. Pitched and tiled. No shading. No windows on roof. Would like a 4 KW system. Contact anytime.

02 Feb

Brigg (DN20)

New Solar PV Installation

Roof: South Facing. Pitched and Slate. Slight Shading from trees. No Windows on Roof. Open to advice on System Size. Install within 1 year. Contact anytime.

02 Feb

Gainsborough (DN21)

New Solar PV Installation

Roof: South Facing. Pitched and Metal Cladding. No Shading. 10+ Window on Roof. Open to advice on System Size. Install within 1 month. Contact anytime.

02 Feb

Retford (DN22)

New Solar PV Installation

Roof: East. Pitched and tiled. No shading. 2 dormer windows. Open to advise on system size. Install ASAP. Contact anytime.

31 Jan

Gainsborough (DN21)

New Solar PV Installation

Roof: South Facing. Pitched and Tiled. Slight Shading from other roofs. 1 Window on Roof. Open to advice on System Size. Install within 1 month. Contact(...)

27 Jan

Grimsby (DN37)

New Solar PV Installation

Supply and fit of Solar PV. Roof faces South, pitched and tiled, no shading, no windows in the roof. Timescale within 3 months. Contact anytime.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue